Transport and installation of prefabricated structures
Abstract
Prefabricated structure is a new form of building structure, which can achieve fast and efficient building construction by prefabricating components in factories and assembling them on site. However, due to human factors, the basic performance of the prefabricated structure such as safety and water resistance is reduced. The state encourages the construction companies to adopt prefabricated buildings, and at the same time should solve the problems encountered in real life, such as the prefabricated installation of concrete is not in place, the surface of prefabricated components and other problems. The following will start from the transportation and installation of prefabricated components, analyze the possible problems, analyze and solve the problems, so as to make people's living environment more comfortable, improve people's recognition of this new building structure form, and make the development prospects of prefabricated buildings more brilliant.
Keywords
Prefabricated structure; Prefabricated components; Installation standard; Installation problem
Full Text:
DOI: https://doi.org/10.26789/szgc.v9i1.1973
Refbacks
- There are currently no refbacks.